Posted in Uncategorized on Oct 25th, 2008 1 Comment »
Here’s a couple pictures of our paint selection process. We ended up going with the one on the corner of the house - the lighter one, not the one on the top painted board. We’ll have a cream-ish trim color and a red-ish accent color and door. They should start painting next week!
Read Full Post »
Posted in Uncategorized on Oct 21st, 2008 No Comments »
One more receptacle box. A bit of wire cleanup. Rough electrical will be done! (assuming I don’t find anything else while cleaning up and reviewing it all).
Need to fix a stud and redo some vent piping to make the stud more vertical. Need to install vents for dryer and water heater.
Read Full Post »
Posted in Uncategorized on Oct 20th, 2008 No Comments »
I’m very close on finishing everything I need for the rough inspection. I’ve got an appointment with a guy next Saturday to talk about drywall and get a bid.
Recently completed:
All ceiling fan boxes mounted and wired.
Can lights on landing wired.
Fixtures in kids bath […]
Read Full Post »
Posted in Uncategorized on Oct 16th, 2008 1 Comment »
Tuesday night
installed can lights in built-in on landing
finished cutting block for ceiling fan in second dormer
installed boxes for plugs under built-in on landing
Wednesday night
Wired boxes for plugs under built in on landing
Hung block for ceiling fan in second dormer with copious amounts of subfloor glue […]
Read Full Post »
Posted in Electrical on Oct 12th, 2008 2 Comments »
Completed in the last week or so:
Ceiling fan box in the open area
Electrical box for the track lights in the open area.
Wall heater in the downstairs bathroom
Ceiling fan box in the first bedroom (only the master left!)
Scaffolding taken down (no longer needed! (until we install […]
Read Full Post »