Posted in Change Log on Apr 29th, 2009 No Comments »
Change Log for Wednesday, April 29th
Met the propane guy and found out that there had been a miscommunication in the number of risers needed for our house. He didn’t have the right amount of materials, so he’s going to come back on Friday morning. Two steps forward, one step back…
[…]
Read Full Post »
Posted in Change Log on Apr 28th, 2009 No Comments »
Change Log for Tuesday, April 28th
The propane trench is dug and the area around the front of the house is graded. Now we shouldn’t have any water pooling up against the house. We went down and watched the tractor for awhile - Gregory in particular was quite excited.
[…]
Read Full Post »
Posted in Change Log on Apr 27th, 2009 No Comments »
Change log for Monday, April 27th
Amber
Ran a burn pile for most of the day, trying to get rid of more construction debris. Made the kids happy by bringing down hot dogs, marshmallows and potatoes to cook in/on the fire for lunch. Emma did school on a makeshift desk by the burn […]
Read Full Post »
Posted in Change Log on Apr 27th, 2009 No Comments »
Change log for Sunday, April 26th
Amber
Helped Matt hang the door to the boys’ room
Moved (yet even more) wood outside from the scrap pile outside the side door
Matt
Installed shutoff valves to the water lines under the kitchen sink to test if cold water comes […]
Read Full Post »
Posted in Change Log on Apr 27th, 2009 No Comments »
Change log for Saturday, April 25th
Amber
Moved (yet more) wood outside
Worked with Matt to start hanging the door to Emma’s room
Helped Matt with the railing
Matt
Finished putting up the first section of railing (yay!)
Started hanging the door […]
Read Full Post »
Posted in Change Log on Apr 24th, 2009 No Comments »
Change log for Friday, April 24th, 2009
Prepped three doorways for door hanging by pounding in the nails, trimming back the drywall, and marking the hinge heights on the doors.
Vacuumed up the mess I made by trimming up the drywall, the kids’ bath, and some of the […]
Read Full Post »
Posted in Change Log on Apr 23rd, 2009 No Comments »
Change log for Thursday, April 23rd, 2009
I drilled holes in 15 balusters to prep them for installation in the first railing section.
I thought about several other projects upstairs, but Nathan woke up early so I moved to the garden. He is far too mobile to be trusted upstairs without a railing. Emma and I weeded […]
Read Full Post »
Posted in Change Log on Apr 20th, 2009 No Comments »
Change log for April 20, 2009
We got our kitchen sink today! It is HUGE - we should be able to bathe multiple children in it easily. Perhaps even all three of them at the same time. Thankfully it fits into our sink cabinet (not that we have a counter yet) and it looks great. I […]
Read Full Post »
Posted in Change Log on Apr 19th, 2009 No Comments »
Change Log for April 19, 2009
(And no, I didn’t forget Saturday’s entry - we gasp didn’t work on the house at all and instead went to Picnic Day at UC Davis. It felt somewhat irresponsible, but we definitely had a good time)
Amber
Moved scrap wood with the kids away from the house […]
Read Full Post »
Posted in Change Log on Apr 17th, 2009 No Comments »
Change log for Friday, April 17th, 2009
Today was a burn day from 9 a.m. - 3:30 p.m. so I burned construction debris for that entire period. I started with untreated wood scraps and then switched to manufactured wood after our fire roasted lunch.
With my father-in-law’s help, […]
Read Full Post »