Posted in Change Log on Apr 16th, 2009 No Comments »
Change log for April 16, 2009
Errand day and a fussy baby made it difficult to do much today…
Picked out a laminate countertop for the kids’ bath
Picked out a manufactured granite countertop for the master bath
Measured the cabinets for the countertops and found that […]
Read Full Post »
Posted in Change Log on Apr 15th, 2009 No Comments »
Change log for Wednesday, April 15th, 2009
Amber
Installed plugs in Emma’s room
Installed blank plate in linen/telecom closet to cover the light future
Vacuumed downstairs
Moved more scrap wood outside
Planned newel post layout with Matt
Matt
Sanded […]
Read Full Post »
Posted in Change Log on Apr 14th, 2009 1 Comment »
Change log entry for Tuesday, April 14th, 2009
Boxed scrap Hardiboard and piled the big pieces
Moved more wood to burn area, bagged trash, heaved pieces of concrete into the gully (gotta love having acreage)
Loaded the trailer (with my father-in-law and Matt) with trash, recycling, Hardiboard, […]
Read Full Post »
Posted in Change Log on Apr 14th, 2009 2 Comments »
Change log entry for Monday, April 13th, 2009
Called Al (our tractor guy) to see about getting him out to dig a trench for propane and do some grading work on the front of the house
Ordered the kitchen sink (and no, we’re not paying anything near that amount […]
Read Full Post »
I’ve decided to start a new feature here on this largely neglected blog. I’m going to try to post every day I work on the house with a brief description of what I’ve done - as a friend put it a little while ago, it’ll be a like a change log for the house. Matt […]
Read Full Post »