Posted in Change Log on May 28th, 2009 No Comments »
Change Log for May 28th, 2009
I spent the day running errands and getting the car serviced. I did pick up some trim kits for the ceiling cans (the ones from the local electrical place didn’t fit) and some caulk. Yippee. I’m going down to the house tomorrow morning though and hopefully I’ll have more to […]
Read Full Post »
Posted in Pictures on May 27th, 2009 No Comments »
Kids’ Bath
Master Bath
Downstairs Bath
Doesn’t the floor in there look nice too? And yes, we’re going to replace the white caulk with something that blends a little better!
And look, I do work on the house too!
(I never thought I would use pnuematic and power tools as easily as I do now…)
Read Full Post »
Posted in Change Log on May 27th, 2009 No Comments »
Change log for Wednesday, May 27th, 2009
I didn’t do much on the house today - made a couple phone calls, put another coat of sealer on the temporary master bath counter, and started cleaning in the rooms that will get linoleum. We have someone coming out on Monday to measure and double check the materials […]
Read Full Post »
Posted in Change Log on May 27th, 2009 No Comments »
Change Log for Tuesday, May 26th, 2009
Matt and I discussed the house and priorities, and I spent some time making some phone calls to various suppliers and subcontractors. While I was running errands in the morning I bought the correct outdoor electrical covers, two more GFI outlets, and the trim for the cans in the […]
Read Full Post »
Posted in Change Log on May 25th, 2009 No Comments »
Change Log for Monday, May 18th through Monday, May 25th
I was visiting family for the better part of last week, and Matt was quite busy with work, so not all that much got done until the weekend. However, the tile guys finished the downstairs bath and it looks great. One of these days I will […]
Read Full Post »
Posted in Change Log on May 17th, 2009 1 Comment »
Change Log for Wednesday, May 13th - Sunday, May 17th, 2009
Well, so much for keeping on top of this!
Over the past couple days I cleaned, tidied, and vacuumed upstairs to get ready to lay more flooring. We received the underlay for the bathrooms, and found that our linoleum flooring may require heat welding to do […]
Read Full Post »
Posted in Change Log on May 12th, 2009 No Comments »
Change Log for Tuesday, May 12th, 2009
I worked for a little while on the small section of flooring upstairs by the master bedroom, but found it slow going. It seems like it should be easy, but we’re trying to be frugal in our use of pieces so it takes a lot of work to find […]
Read Full Post »
Posted in Change Log on May 12th, 2009 No Comments »
Change Log for Monday, May 11th, 2009
Matt installed some of the shower trim in the Master bath (ooh, shiny!) and reinstalled the light fixture in the entry. Unfortunately the beam isn’t flat on the bottom, so the light fixture is a little out of true. We’re hoping that some shims will help.
Matt and I also […]
Read Full Post »
Posted in Change Log on May 12th, 2009 No Comments »
Change Log for Sunday, May 10th, 2009
Since it was Mother’s Day and there wasn’t anything pressing that I needed to work on in the house, I opted to work in the garden while Matt sanded the floor upstairs and started laying out the railing.
Read Full Post »
Posted in Change Log on May 12th, 2009 No Comments »
Change Log for Saturday, May 9th, 2009
Matt worked on flooring and got the main long run finished. Yay!
I ran some errands and did some smaller stuff, none of which I can particularly remember. And this is why I should be doing these entries more regularly…
Read Full Post »