Feed on
Posts
Comments

Archive for May, 2009

Change Log 05.08.09

Change Log for Friday, May 8th, 2009

More flooring upstairs.  At least I’m getting a little faster at it…

The linoleum flooring for the bathrooms, utility, mudroom and pantry also arrived today.  

Read Full Post »

Change Log 05.07.09

Change Log for Thursday, May 7, 2009

I picked up the plumbing pieces for the master bathroom shower and got some miscellaneous things at the hardware store.  I tried to order the counter for the master bathroom, but found that the person who had given me the quote did it incorrectly and the real cost is more than […]

Read Full Post »

Change Log 05.06.09

Change Log for Wednesday, May 6th, 2009

The tile guys are still working away and Matt worked on the flooring upstairs.  We’re over half-way there!

Read Full Post »

Change Log 05.05.09

Change log for May 5th, 2009

Matt and I both laid some flooring today.  I’m starting to wish we had wider planks.  It is slow going, but at least progress is being made.  The tile is really looking nice though - I am so glad we hired this out.  They are doing a wonderful job.  If […]

Read Full Post »

Change Log 05.04.09

Change Log for Monday, May 4, 2009

I installed wood flooring upstairs for a couple hours.  The inspector came by and signed off on our propane lines, so we are set to get our tank installed.  Once the ground dries out a bit (we’ve gotten something like 3.5″ of rain since Friday!) I’ll bury the propane […]

Read Full Post »

Change Log 05.03.09

Change Log for Sunday, May 3rd, 2009

Amber

Learned how to install wood flooring Installed wood flooring

Matt

Installed flooring, taught me how to install flooring Started building the trim for the light in the entry

Read Full Post »

Change Log 05.02.09

Change Log for Saturday, May 2nd, 2009

Matt

Worked on the wood flooring upstairs - this was fairly challenging because the long wall is not straight, making the first run of flooring rather complicated.

Amber

Filled nail holes on the railing with wood putty Finally finished the plug […]

Read Full Post »

Change Log 05.01.09

Change Log for May 1, 2009

My Mom stained Emma’s door Put a coat of finish on the two stained bedroom doors (and wow does that stuff stink!) Started sanding the railing in preparation for staining Our propane pipe installation passed inspection so […]

Read Full Post »

Change Log 04.30.09

Change Log for April 30, 2009

Ordered the counter for the kids’ bathroom Bought some supplies for staining the doors Uhh…  obviously I can’t go this long without updating the site because I can’t remember if I did anything else.  I know I did some work […]

Read Full Post »

« Prev