Posted in Change Log on Jun 17th, 2009 2 Comments »
I’m not sure if anyone is still reading this, but anyways…
We have hot water now! Our propane tank is all hooked up and the hot water heater works. This was particularly welcome because I spent part of the afternoon pulling up poison oak with my bare hands. I was able to wash up with warm […]
Read Full Post »
Posted in Pictures on Jun 15th, 2009 No Comments »
First off, the railing. It isn’t quite finished, but we can at least let the kids upstairs without worrying so much!
Here’s our kitchen countertops
A shot of the end grain - they are finger jointed butcher block countertops, made by Perfect Plank in Chico, CA.
Here’s the mudroom and utility room with their new flooring
And the kids’ […]
Read Full Post »
Posted in Change Log on Jun 15th, 2009 No Comments »
We’re really making some headway on our list these days! Over the past week we did a lot of cleaning up and we got ready for our flooring installation today. We also had the propane tank set today and our kitchen counters were delivered.
I installed plugs in Matt’s office and finally put a switch plate […]
Read Full Post »
Posted in Uncategorized on Jun 8th, 2009 No Comments »
Change Log for Friday, June 5th to Monday, June 8th
I finished painting the sink area of the kids’ bath and finished the walls in the shower area
I did lots of cleaning downstairs
Matt installed the sinks, faucets and drains for the kids’ bath and […]
Read Full Post »
Posted in Change Log on Jun 4th, 2009 No Comments »
Change Log for Friday, May 29th through Thursday, June 4th
I did a lot of cleaning up and organizing on Friday and through the weekend to prepare for having someone out to measure for our linoleum install. I also bought paint and I am working on painting the kids’ bath before the linoleum is laid down […]
Read Full Post »